End-to-End Workflow

This is the path from a new project to a LOFT-Sim run, one step at a time. Each step names what to do and links to the page that has the full instructions.

Steps

  1. Create or open a project. Start the launcher, click New Project, choose a blank canvas, a real-world OSM background or the Ann Arbor sample, and open the project in JOSM. See Create a Project.
  2. Draw the raw network. On the airspace_network.osm layer, draw each corridor as a JOSM way in its direction of travel. See Drawing.
  3. Turn the geometry into airspace objects. Apply the Corridor, Vertiport and other presets from the right-click menu Create from LOFT Preset, then press Auto-Split Corridors in the left sidebar where a way passes through a shared node, a vertiport, an intersection or a diverging point. See Presets and the Object Schema Panel for every attribute of an object.
  4. Add CNS sites (optional). Place communication, navigation and surveillance sites on the infrastructure.osm layer. See CNS Infrastructure.
  5. Configure and preview smoothing. Open Configuration > Configure Corridor Smoothing; it writes config/additional.xml and opens the smoothing preview. See Smoothing.
  6. Create routes. Select corridors in travel order, right-click and choose Create Route or Create Route from Selection. Route flows need them; OD-only demand can skip this step. See Create Routes.
  7. Add demand. In the Demand Panel, click Add and define OD or route flows. See Demand Panel.
  8. Write the simulation configuration. Once at least one flow is saved, open Configuration > Write Simulation Config and set the strategic layer, run length, seed and outputs. See Simulation Configuration.
  9. Validate. Run Validation > Validate, which checks the whole project; fix the findings, then run JOSM’s own validator (Shift+V) once on each layer. See Validation.
  10. Export the package. Open Configuration > Export Package to write one self-contained scenario folder. See Export Package.
  11. Run it in LOFT-Sim. Validate and run the package’s config/simulation_config.xml with loft-sim. See Run in LOFT-Sim.

Track Your Progress

The menu entry Workflow Checklist > Workflow Checklist opens a window that marks each of these steps done or not done for the open project, with buttons that run the next action. See Workflow Checklist.

See a Finished Project

The Ann Arbor North Campus sample is a complete project: network, CNS sites, routes, route-flow demand and LOFT-Sim configuration files. See Example Projects for how to open it.